Tuesday, August 22, 2006

Egg Free Salmon Burgers

ANNOUNCES THE ARRIVAL AND DEPARTURE OF ALL FLIGHTS FROM THE AIR BRIDGE



efficiently to support in the mobilization of about 7000 passengers per day, over a hundred flights served by the Airlift. This modernization expanded parking area for aircraft positions Fokker-50 aircraft, Fokker-100, McDonnell Douglas MD-83 and Boeing B-757. Here also an area with 28 positions for passenger check-eight self check-in positions, a large boarding area, a VIP room equipped with amenities for frequent travelers and a general waiting room. was given a baggage belt distributed in 986 square meters.

According to the President of the Carrier, Fabio Villegas Ramirez: "Re-arrangement of Airlift Terminal in Bogota forward by the standards of service regulated by the International Air Transport Association, IATA, constituting a decisive step in order to give travelers an agile and comfortable, allowing this new infrastructure, efficient connections and travel arrangements in minimum time ".

fundamental part of the project also includes the concentration of land arrivals in the east wing of the terminal, through the construction of a separate bay for public service vehicles, which will speed the entry of travelers to the Terminal.


0 comments:

Post a Comment