installation process subracks and wiring in the structure of the second cabinet OSIRIS electronics in the electronics workshop of the IAC.
Installation of the panels on the structure of one of the cabinets of electronics in the machine shop of the IAC.
Details inside one of the two electronics cabinets with different OSIRIS subracks integrated routing and final wiring.
0 comments:
Post a Comment